Interregional Data Map

Lake Erie Loop Flow
-196 MW
01.17.2021 23:50:10 EDT
PJM Real-Time Load: 84,261 MW
 
PJM (MISO): $19.08
4,126 / 1,989 MW
MISO LMP: $23.23
PJM (DEOK): $19.66
Ohio Valley Electric Corporation (OVEC)
PJM (EKPC): $19.35
547 / 73 MW
Louisville Gas and Electric Company (LGEE)
PJM (AEP): $19.35
722 / 95 MW
Tennessee Valley Authority (TVA)
PJM (AEP): $19.35
47 / 0 MW
CPL Retail Energy West (CPLW)
PJM (AEP): $19.35
332 / 220 MW
Duke Energy
PJM (DOM): $19.35
580 / 54 MW
CPL Retail Energy East (CPLE)
PJM (Neptune): $20.09
0 / 0 MW
NYISO (Neptune): $18.37
PJM (Linden): $20.09
253 / 250 MW
NYISO (Linden): $18.17
PJM (Hudson): $20.29
100 / 100 MW
NYISO (Hudson): $18.21
PJM (NYISO): $19.84
809 / 862 MW
NYISO LMP: $15.68
LMP Values
(USD)
Interregional Map Legend the direction of actual flow Interregional Map Legend actual flow is from a lower interface price to
a higher interface price
Interregional Map Legend actual flow is from a higher interface price to
a lower interface price
Interregional Map Legend an interface without a corresponding
external interface price
Interregional Map Legend actual flow across interface Interregional Map Legend scheduled flow across interface

This map shows the flow of electricity into and out of PJM.  The details are zone based showing the flow, interfaces, prices and the real-time load (MW).